000 01072ntm a2200265 a 4500
001 vtls000094302
003 KUKTEM
005 20251117113321.0
008 160406t2015 my a f 000 0 eng d
020 _aTHE0005362(Local)
039 9 _a201905151213
_bhanafiah
_y201604061145
_zhuda
040 _aUMP
090 _aFKP .J47 2015 r Bc.
100 1 _aLaw, Jessica Ka Ing
245 1 _aAnalysis and countermeasure to improve machine efficiency by using overall equipment effectiveness (OEE) method /
_cJessica Law Ka Ing
260 _aKuantan, Pahang :
_bUMP,
_c2015
300 _axv, 97 p. :
_bill. (some col.) ;
_c30 cm.
500 _aFaculty of Manufacturing Engineering
502 _aProject Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2015
504 _aBibliography: p. 84
610 2 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c6617
_d6623
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*6100*6500*6501*9992