000 02029nam a2200229 a 4500
001 vtls000030093
003 KUKTEM
005 20251114204347.0
008 080709t2007 my f m 000 0 eng|d
020 _aTHE0005930(Local)
039 9 _a201905141454
_baida
_c201107132029
_dVLOAD
_c200908141457
_dVLOAD
_c200908141428
_dVLOAD
_y200807091519
_zkam
040 _aUMP
090 _aTA492.S25 D34 2007 rs
100 3 _aDahrul Akma Mohd Sabri
245 1 0 _aDesign and fabrication of shear test rig for sandwich cores /
_cDahrul Akma Bin Mohd Sabri
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _a56 p. :
_bill. (some. col.) ;
_c30 cm.
502 _aProject paper (Diploma of Mechanical Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aThis project is focused on redesign the current model of shearing testing instrument and it is also used for testing the shear in sandwich constructions in order of driving the need for efficient, safe cost effective and stability of sandwich core upon the shear loading. The device consists of two main components; a stationary upper platform and a lower platform that contains a base as stage. The principle of operation is that the tissue samples are affixed to both the upper and lower platforms using a thin layer of superglue then bathed in an appropriate physiological solution. The lower platform is moved relative to the fIxed upper platform using the base stage in order to applied load. The test is performed by clamping a test specimens attached in a 20 millimeters width specimen between two metal fIxtures. An upper punch is then forced through the base in the metal fIxture causing shear along the edge of the facing. A universal testing machine is used to push the punch until shearing of the specimen occurs. The manufacturing process included in this project is cutting of material, machining, drilling, threading and finishing.
650 0 _aSandwich construction
999 _aVIRTUA40
_c671
_d677
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*9992