000 02770ntm a2200289 a 4500
001 vtls000098112
003 KUKTEM
005 20251117113325.0
008 161118s2016 my da f abm 000 0 eng d
020 _aTHE0000527(Local)
039 9 _a201905151609
_bnazirah
_c201712121025
_dfateeha
_y201611180959
_zsaini
040 _aUMP
090 _aFKASA .L54 2016 r Bc.
100 1 _aLiew, Tzun Ming
245 1 0 _aStudy of parking parameters and parking management in Hospital Tengku Ampuan Afzan (HTAA), Kuantan /
_cLiew Tzun Ming
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _axiii, 66 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 _aBibliography : p. 50-51
520 _aParking is regarded as an integral part of urban transportation system, and the increase in the number of vehicles had caused problems with parking in major cities around Malaysia. The Hospital Tengku Ampuan Afzan (HTAA) in Kuantan is not sparred from this problem too, while the number of patients and staffs at the hospital keeps increasing each year, the number of parking lots in the car park are still the same, which had caused difficulties for its visitors to search for parking, and contributed to the illegal parking by the roadside along the main entrances. This study aims at assessing the supply and demand of the car parking system as well as the parking parameters in Hospital Tengku Ampuan Afzan (HTAA), Kuantan. Besides, this study will also present the actual figures of the number of illegally parked vehicles within the hospital compound, as well as those by the roadside along the main entrances. This data, along with the other parking parameters studied in this study, will present the actual parking demand in HTAA. Corrective measure is suggested in this study to improve the parking woes in HTAA. In this study, parking supply is defined as the number of parking lots provided at the hospital, and parking demand is meant by the summation of parking accumulation and the number of illegally-parked vehicles. License plate survey is chosen for this study, as it provides data of higher accuracy and consistency. The methodology of this study involved data collection, data analysis and recommendations to improve the situation.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4052
_zAccess in library only
999 _aVIRTUA40
_c6745
_d6751
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992