000 02693ntm a2200289 a 4500
001 vtls000098342
003 KUKTEM
005 20251117113326.0
008 161208s2015 my da f abm 000 0 eng d
020 _aTHE0000097(Local)
039 9 _a201905131327
_baishah
_c201712141640
_dsaini
_y201612081057
_zsaini
040 _aUMP
090 _aFIM .T36 2015 r Bc.
100 1 _aTan, Kean Wei
245 1 2 _aA study of delay sources of construction project in Kuantan area /
_cTan Kean Wei
260 _aKuantan, Pahang :
_bUMP,
_c2015
300 _axii, 75 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Industrial Management
502 _aProject Paper (Bachelor Degree (Hons) of Project Management) -- Universiti Malaysia Pahang – 2015
504 _aBibliography : p. 61-65
520 3 _aDelays are general phenomenon because construction projects are considered to be a common national issue in almost every construction project around the world and Malaysia could not an exception. This research study about the delay sources of construction project which located in Kuantan area. The objective of this project is to identify the delay sources in construction project and also to analyze the risks of delay sources for construction project in Kuantan area. This study is conducted to find out the numerical value of Risk Priority Number (RPN) from the data and information gained by the targeted respondents through the survey questionnaires. Through RPN, we can identify that most important problem(s) and gives a model to allocate the limited resource in order to minimize the effect on project by delay. The findings of research could increase the awareness and contribute to the construction industry especially in Kuantan area. The identified risk of delay sources are categorized to delay factors related to contractor, consultant, owner and external factors. The findings indicate that the risk of delay sources that related to contractor should be emphasized and focus to minimize the occurrence of delay incident in construction project. To address this issue, the project team should conduct proper risk management to ensure that the progress of project is smoothly. All the result are obtained by performing analysis by SPSS version 2.0 and Microsoft Excel 2012, all the data is been recorded in this research.
610 2 0 _aFaculty of Industrial Management
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/25642
_zAccess in library only
999 _aVIRTUA40
_c6764
_d6770
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992