100 0 _aNurul Syakirah Binti Mohd Ali
245 1 2 _aA study to identify the factor that causes project delay in construction at Terengganu /
_cNurul Syakirah Binti Mohd Ali
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _ax, 46 p. :
_bill. (some col.) ;
_c30 cm.+
_e1 CD-ROM
500 _aFaculty of Industrial Management
502 _aProject Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016
504 _aBibliography
520 2 _aThis survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster.
610 2 _aFaculty of Industrial Management
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4160
_zAccess in library only
999 _aVIRTUA40
_c6813
_d6819
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992