| 245 | 1 | 2 |
_aA study to identify the factor that causes project delay in construction at Terengganu / _cNurul Syakirah Binti Mohd Ali |
| 260 |
_aKuantan, Pahang : _bUMP, _c2016 |
||
| 300 |
_ax, 46 p. : _bill. (some col.) ; _c30 cm.+ _e1 CD-ROM |
||
| 500 | _aFaculty of Industrial Management | ||
| 502 | _aProject Paper (Bachelor Degree in Project Management with Honors) -- Universiti Malaysia Pahang – 2016 | ||
| 504 | _aBibliography | ||
| 520 | 2 | _aThis survey was conducted to find the factors causing time overrun (delay) from the contractor perspective. The objective of this study was to identify the factors and in order to rank the most influence factor. Sets of questionnaires were developed and data was collected by hand distributed and email. The scope of study focused on the construction project in Terengganu. The respondent of this study obtain from contractors registered under G7 with CIDB. The result of this study showed that the higher rate in delay come from external factor. External factor consist three subjects such as weather condition, natural disaster and unavoidable disaster. | |
| 610 | 2 |
_aFaculty of Industrial Management _xDissertations |
|
| 650 | 0 |
_aUniversities and Colleges _xDissertations |
|
| 650 | 0 | _aTheses | |
| 856 | 4 | 0 |
_uhttp://ecollib.ump.edu.my/id/eprint/4160 _zAccess in library only |
| 999 |
_aVIRTUA40 _c6813 _d6819 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992 | ||