000 02250nmm a2200313 a 4500
001 vtls000098453
003 KUKTEM
005 20251117113331.0
008 161214s2016 my fq d 001 0 eng d
020 _aTHE0005116(Local)
039 9 _a201905131518
_bhanafiah
_c201712121448
_dfateeha
_y201612141153
_zsaini
040 _aUMP
090 _aFKP .N35 2016 r Bc.
090 _aCD 10447
100 0 _aMuhammad Najmi Ahmat
245 1 0 _aProductivity improvement using VSM at TT Electronis Sdn Bhd
_h[electronic resource] /
_cMuhammad Najmi Ahmat
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _a1 computer disc :
_bdigital data ;
_c12 cm.
500 _aFaculty of Manufacturing Engineering
500 _aTheses Gred B
502 _aProject Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016
520 3 _aThis project presents the application of the VSM as improvements at TT electronics Sdn Bhd. A process is the transformation of raw materials into product that custom needed. An operation is the from receiving raw material, tinning, winding, forming, header assembly, epoxy application, oven curing, cooling, cutting, pitch 1-VMI,boundary VMI, VMI, VMI mantis, testing and packaging. The objectives of this project are to study existing process of product HA00-10502LF, to eliminate waste and non-value added in the process and to improve productivity by using Value Stream Mapping. The methodology was creates by draw the current state of the VSM and generate the future state of VSM to developed the improvement action plan, the future value stream map was plotted and the improvement was highlighted at selected area that needs to improve. The simulation model of the future stream map was build using Witness software. The tool of VSM used in this project successfully achieved.
538 _aItem in PDF format
610 2 0 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4034
_zAccess in library only
999 _aVIRTUA40
_c6923
_d6929
999 _aVTLSSORT0080*0200*0400*0900*0901*1000*2450*2600*3000*5000*5001*5020*5200*5380*6100*6500*6501*8560*9992