000 02588nmm a2200313 a 4500
001 vtls000098457
003 KUKTEM
005 20251117113332.0
008 161214s2016 my fq d 001 0 eng d
020 _aTHE0005120(Local)
039 9 _a201905131521
_bhanafiah
_c201712081539
_dsaini
_y201612141211
_zsaini
040 _aUMP
090 _aFKP .A84 2016 r Bc.
090 _aCD 10451
100 0 _aWan Nurul Athia Wan Mohd Zamani
245 1 2 _aA study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining
_h[electronic resource] /
_cWan Nurul Athia Wan Mohd Zamani
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _a1 computer disc :
_bdigital data ;
_c12 cm.
500 _aFaculty of Manufacturing Engineering
500 _aTheses Gred A
502 _aProject Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016
520 3 _aThis thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better work sequence. The project method conducted is by doing the Gemba Walk and observed the OFI (Opportunity for Improvement). 5S had been implement based on the problem observe from the line production. The aim is to increase the cleanliness, safety for operator by using PPE (Personal Protective Equipment) and the training to discipline the operator. For standardized work, cycle time need to be record for before and after. The non-value added is reduce in the time taken to increase the line efficiency. Standardized work is made using simulation of Tecnomatix Software which is the plant need to be arrange like actual layout and insert the cycle time for each machine. For the result, 5S method that had been implement has been awarded as a ‘Best Line 3S Finding Activity’ and ‘5S best Practice’. For standardized work the line efficiency increase from 70.23% to 95.43% and the transportation material time success to be reduce from 49.71% to 4.57%.
538 _aItem in PDF format
610 2 0 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4097
_zAccess in library only
999 _aVIRTUA40
_c6940
_d6946
999 _aVTLSSORT0080*0200*0400*0900*0901*1000*2450*2600*3000*5000*5001*5020*5200*5380*6100*6500*6501*8560*9992