| 000 | 02588nmm a2200313 a 4500 | ||
|---|---|---|---|
| 001 | vtls000098457 | ||
| 003 | KUKTEM | ||
| 005 | 20251117113332.0 | ||
| 008 | 161214s2016 my fq d 001 0 eng d | ||
| 020 | _aTHE0005120(Local) | ||
| 039 | 9 |
_a201905131521 _bhanafiah _c201712081539 _dsaini _y201612141211 _zsaini |
|
| 040 | _aUMP | ||
| 090 | _aFKP .A84 2016 r Bc. | ||
| 090 | _aCD 10451 | ||
| 100 | 0 | _aWan Nurul Athia Wan Mohd Zamani | |
| 245 | 1 | 2 |
_aA study & implementation of kaizen strategy for line production (cap cam shaft) in Sapura Machining _h[electronic resource] / _cWan Nurul Athia Wan Mohd Zamani |
| 260 |
_aKuantan, Pahang : _bUMP, _c2016 |
||
| 300 |
_a1 computer disc : _bdigital data ; _c12 cm. |
||
| 500 | _aFaculty of Manufacturing Engineering | ||
| 500 | _aTheses Gred A | ||
| 502 | _aProject Paper (Bachelor of Engineering in Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016 | ||
| 520 | 3 | _aThis thesis deal with Kaizen strategy which is implementation of 5S and purpose for standardized work. The project background is in Sapura Machining Corporation. The objective of this thesis is to implement the 5s method in line production Capcam Shaft and to purpose a standardized work for a better work sequence. The project method conducted is by doing the Gemba Walk and observed the OFI (Opportunity for Improvement). 5S had been implement based on the problem observe from the line production. The aim is to increase the cleanliness, safety for operator by using PPE (Personal Protective Equipment) and the training to discipline the operator. For standardized work, cycle time need to be record for before and after. The non-value added is reduce in the time taken to increase the line efficiency. Standardized work is made using simulation of Tecnomatix Software which is the plant need to be arrange like actual layout and insert the cycle time for each machine. For the result, 5S method that had been implement has been awarded as a ‘Best Line 3S Finding Activity’ and ‘5S best Practice’. For standardized work the line efficiency increase from 70.23% to 95.43% and the transportation material time success to be reduce from 49.71% to 4.57%. | |
| 538 | _aItem in PDF format | ||
| 610 | 2 | 0 |
_aFaculty of Manufacturing Engineering _xDissertations |
| 650 | 0 |
_aUniversities and Colleges _xDissertations |
|
| 650 | 0 | _aTheses | |
| 856 | 4 | 0 |
_uhttp://ecollib.ump.edu.my/id/eprint/4097 _zAccess in library only |
| 999 |
_aVIRTUA40 _c6940 _d6946 |
||
| 999 | _aVTLSSORT0080*0200*0400*0900*0901*1000*2450*2600*3000*5000*5001*5020*5200*5380*6100*6500*6501*8560*9992 | ||