000 01168nam a2200313 a 4500
001 vtls000074064
003 KUKTEM
005 20251125095339.0
008 130902t2013 enka f b 000 0 eng d
020 _a9780727735058
020 _a0727735055
039 9 _a201404150934
_bjamie
_y201309020956
_zfauzi
040 _aUMP
090 _aTH375 .C53 2013
245 0 0 _aEffective site investigation /
_cprepared by C.R.I. Clayton, D.M. Smith on behalf of Site Investigation Steering Group, Highways Agency, NetworkRail
260 _aLondon, England :
_bICE Pub.,
_cc2013
300 _aix, 86 p. :
_bill. ;
_c30 cm.
490 1 _aSite investigation in construction series
504 _aIncludes bibliographical references
650 0 _aBuilding sites
_zGreat Britain
_xPlanning
650 0 _aSoil mechanics
700 1 _aSmith, D. M.
710 2 _aSite Investigation Steering Group
710 2 _aNetwork Rail (Firm)
710 1 _aGreat Britain.
_bHighways Agency
830 0 _aSite investigation in construction series
999 _aVIRTUA40
_c70496
_d70502
999 _aVTLSSORT0080*0200*0201*0400*0900*2450*2600*3000*4900*5040*6500*6501*7000*7100*7101*7102*8300*9992
942 0 0 _03