000 02696ntm a2200289 a 4500
001 vtls000098270
003 KUKTEM
005 20251117113336.0
008 161205t2016 my a f m 000 0 eng d
020 _aTHE0000063(Local)
039 9 _a201905131242
_baishah
_c201712141623
_dsaini
_y201612051235
_zfateeha
040 _aUMP
090 _aFIM .L56 2016 r Bc.
100 1 _aLim, Pei Jiun
245 1 0 _aAdoptation of engine for smaller enterprise (E4SE) performance measurement system (PMS) in small project based company in Malaysia /
_cLim Pei Jiun
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _axiii, 75 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Industrial Management
502 _aProject paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2016
504 _aBibliography : p. 56-62
520 3 _aThis research was conducted to test the validity of the new performance measurement system which is the Engine For Smaller Enterprise, E4SE model and make the recommendation implementation of the E4SE model in the small project based companies in the SMEs industry. The performance measurement system of E4SE model is the tool to evaluate the internal and the external of the enterprises through different aspect such as through management level and level competitors or rivals. Thus, the future strategic plan will be developed in order to sustain survival of the companies. This performance measurement system framework includes the three main elements, Strategy Formulation Activities (SFA), Strategy Administration Activities (SAA) and Performance. The survey questionnaire was distributed to the management cadre or the company’s owner-manager of the company respectively. A total sample of 49 samples was used in this study. Research objective had been achieved through the data analysis finalized by using Microsoft Excel 2007. The results of this study showed that the small project based companies in the SMEs industry is suitable to implement the modified E4SE model based on the data collected and analysis in Malaysia. From this study, the implementations of the E4SE model in the small and medium industry not only increase the potential of the company, but also raising the awareness of the implementation performance measurement system in the organization.
610 2 0 _aFaculty of Industrial Management
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4117
_zAccess in library only
999 _aVIRTUA40
_c7050
_d7056
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992