000 01859nam a2200229 a 4500
001 vtls000029388
003 KUKTEM
005 20251114204348.0
008 080611t2007 my a f m 000 0 eng d
020 _aTHE0001547(Local)
039 9 _a201905271059
_basmadi
_c201211021612
_dFida
_c201107132034
_dVLOAD
_c200908141505
_dVLOAD
_y200806111041
_zfara
040 _aUMP
090 _aHD2365 .A35 2007 rs Thesis
100 0 _aAhmadian Majidi @ Baha
245 1 0 _aVariation of contract price determination in design and build method /
_cAhmadian bin Majidi @ Baha
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _axviii, 106 p. ;
_c30 cm.
502 _aProject paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aNowadays, construction industry in Malaysia move rapidly equivalence with economic growth. Expanding of the construction industry, reveal usage of construction project delivery method. One of construction delivery method rapidly usage is Design and Build method. In this study, there are 30 respondents have been selected from around Malaysia that help out to identify problems always occur in Design and Build method. Besides that, the study also has been made on usage variation of Design and Build method among selected construction agencies. Within usage of the variation method, there are a few factors and criteria need to be considered in selection of the variation method as construction project delivery method. After that, the study continues on identifying usage type's determination of contract price which exist in construction. However the contract price usage has a few criteria as guidance in selection of the contract price method for a construction project. -Author
650 0 _aContracting out
999 _aVIRTUA40
_c710
_d716
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*9992