000 02135ntm a2200289 a 4500
001 vtls000098279
003 KUKTEM
005 20251117113340.0
008 161206s2016 my da f abm 000 0 eng d
020 _aTHE0000099(Local)
039 9 _a201905131332
_baishah
_c201712141642
_dsaini
_c201612061523
_dsaini
_y201612060943
_zsaini
040 _aUMP
090 _aFIM .W66 2016 r Bc.
100 1 _aWong, Eng How
245 1 2 _aA study of simulation modeling in door frame production /
_cWong Eng How
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _axv, 97 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Industrial Management
502 _aProject Paper (Bachelor Degree (Hons) of Industrial Technology Management) -- Universiti Malaysia Pahang – 2016
504 _aBibliography : p. 91-94
520 3 _aThis study discusses about assessing and enhancing the production line in door frame industries by using simulation method. The scope of this study is focusing on the production processes of a Door Frame Factory. The time frame covered is one year which is in year 2015. Simulation is a planning tool, implemented in the processes which required by the factory to meet the changing demands of the products. Modeling door frame production will be developed using Arena simulation software to test run and make comparison with the real world system. It is a quantitative study which the performance of the processes is measured by average wait time, machine utilization and operator utilization for the entire system of door frame production. The results obtained from the simulation software will act as an attempt to simulate the “What-If Analysis” scenarios to forecast the performance of real world system without developing costly implementation.
610 2 0 _aFaculty of Industrial Management
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/4156
_zAccess in library only
999 _aVIRTUA40
_c7162
_d7168
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992