000 03509ntm a2200373 i 4500
001 vtls000102972
003 KUKTEM
005 20251117113342.0
008 180220s2017 my da f am 000 0 eng d
020 _aTHE0001395(Local)
039 9 _a201905211141
_basmadi
_y201802201557
_zsaini
040 _aUMP
_beng
_cUMP
_erda
090 _aFTeK .N37 2017 r Thesis
100 1 _aNaser, Mohamed M Muftah,
_eauthor.
245 1 0 _aInvestigation of pedestrian crossing facilities along Jalan Ampang /
_cMohamed M Muftah Naser
264 1 _aKuantan, Pahang :
_bUMP,
_c2017
264 4 _c© 2017
300 _axiv, 115 pages :
_billustrations (some color), chart ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Engineering Technology
502 _aThesis (Master of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 _aIncludes bibliographical references
520 3 _aMost individual journey no matter what the basic user mode, starts or ends with walking section; so, walking is an essential element of all travel. Walking Behavior the pedestrian flow characteristics lay the foundation for planning and design walking facilities. Therefore, needs must be access to pedestrian facilities in the design of transport facilities. Includes pedestrian facilities Sidewalks, tracks, corridors, and stairs, reduction of cuts and ladders, and transit positions. These facilities should be carefully assessed for mitigation Congestion and enhanced walking in the central business area and sustainable society. But traditional valuation methods are flawed, new the approach to improving the current assessment must be constantly investigated Methods. The study assesses corridors and passages in the city Kuala Lumpur, Jalan Ampang. The results for traffic volume flow with the pedestrian crossing account at signalized and illegal indicated that the number for all vehicles, motorcycle, adult male, adult female, pedestrian signalized crossing and pedestrian illegal crossing varies considerably depending on the time range (30 minutes). The total number of 4-wheel vehicles were more than the total number of motorcycles. Also, the total number of pedestrians on the signalized and crossing in relation to the pedestrians crossing street, pedestrian crossing behavior (walked/origin time or waiting/crossing time to walked/destination time) were recorded and analyzed video graphic survey methods was used for pedestrian counts, having advantage over the manual method. Flow, speed, density and effective width of the walkway were the variables measured. Some on the positions identified, or office after extracting the data from the video. Hand tape, masking tape, stop watch and video camera/ tripod stand were the tools/apparatus used on various positions for collecting data. The flow rate calculated, in conjunct ion with HCM were used to estimate LOS. Analysis was conducted on the flaws identified so as to improve on the current method of estimation.
610 2 0 _aFaculty of Engineering Technology
_xDissertations
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
999 _aVIRTUA40
_c7213
_d7219
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2640*2641*3000*3360*3361*3370*3371*3380*3381*3470*5000*5020*5040*5200*6100*6500*6501*9992