000 02605nam a2200289 a 4500
001 vtls000099123
003 KUKTEM
005 20251117113343.0
008 170418t2016 my a f m 000 0 eng d
020 _aTHE0005419(Local)
039 9 _a201905151503
_bhanafiah
_c201712141249
_dnazri
_y201704181244
_zfateeha
040 _aUMP
090 _aFKP .S93 2016 r Bc.
100 0 _aNur Syahirah Ismail
245 1 _aAnalysis and countermeasure to improve overall equipment effectiveness (OEE) on chassis line at Tan Chong Industry /
_cNur Syahirah Ismail
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _axv, 75 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Manufacturing Engineering
502 _aProject Paper (Bachelor of Manufacturing Engineering (Hons.)) -- Universiti Malaysia Pahang – 2016
504 _aBibliography: p. 60
520 3 _aOverall Equipment Effectiveness (OEE) is a powerful metric of manufacturing performance incorporating measures of the utilization, yield and efficiency of a given process, machine or manufacturing line. When associated with the reasons for performance loss, OEE provides the means to compare and priorities improvement efforts. This project assesses the current condition of Chassis-Final Assembly lines of Nissan Tan Chong Motor Assemblies Sdn Bhd, a company of car manufacturer in order to reduce unplanned downtime due to line stoppages to maximize the productivity. Before obtaining the data to calculate the existing OEE value, the product or process that have the highest downtime rate need to be identified at Chassis-Final Assembly Department. The methods used to analyze these various causes were control chart to find the out of control point, Pareto Analysis to find the critical problem, Ishikawa diagram to find causes affecting the problem, and 5W1H to proposed the recommendation. After knowing the causes of various activities that leads to high downtime rate, then recommendations for OEE improvements are 84.35% and 84.31% for A, and B shift respectively. From the existing to world class ranking OEE there are improved by 4.51% and 4.71% for A, and B shift respectively, that could be used by Nissan Tan Chong Motor Assemblies Sdn Bhd were ready to be made.
610 2 0 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/25838
_zAccess in library only
999 _aVIRTUA40
_c7237
_d7243
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992