000 01113ntm a2200265 a 4500
001 vtls000101019
003 KUKTEM
005 20251117113345.0
008 170818t2017 my a f m 000 0 eng d
020 _aTHE0005329(Local)
039 9 _a201905151058
_bhanafiah
_c201708181606
_dnazri
_y201708181605
_znazri
040 _aUMP
090 _aFKP .E99 2017 r Bc.
100 0 _aEzza Elyana Mohamad Nor
245 1 0 _aCost estimation of remanufacturing crankshaft by integrating mahalanobis-taguchi system and activity-based costing /
_cEzza Elyana Mohamad Nor
260 _aKuantan, Pahang :
_bUMP,
_c2017
300 _axiii, 113 p. :
_bill. ;
_c30 cm.
500 _aFaculty of Manufacturing Engineering
502 _aProject Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2017
504 _aIncludes bibliographical references
610 2 0 _aFaculty of Manufacturing Engineering
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c7289
_d7295
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*6100*6500*6501*9992