000 02098nam a2200229 a 4500
001 vtls000031062
003 KUKTEM
005 20251114204349.0
008 080821t2007 my f m 000 0 eng|d
020 _aTHE0005999(Local)
039 9 _a201905151059
_baida
_c201107132040
_dVLOAD
_c200908141511
_dVLOAD
_c200908141441
_dVLOAD
_y200808211001
_zkam
040 _aUMP
090 _aTD793.9 .R69 2007 rs Thesis
100 0 _aMohd Rozaimi Arshad
245 1 2 _aA case study on manufacturing waste reduction through just in time /
_cMohd Rozaimi Bin Arshad
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _a62 p. :
_bill. ;
_c30 cm.
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2007
520 3 _aThe waste reduction through JIT concept that can reduce cycle time is difficulty to find a good solution. However after make solution of this project and discuss with engineer have many constraint that cannot apply in reduce cycle time. In classify the waste that occur in production line of product 4900-X-319 is successful. This product have about 5 types of waste is defect product, motion, transportation, processing and waiting time. To collect this information some observation has to do and discuss with engineer. The cycle time from this product have to collect using stopwatch. The data have to measure at least 3 times because in engineering the accurate data is important. While collect the data each process of this product has to understand and this will give idea to provide a solution about reducing cycle time. After that make line balancing of 4900-X-319 and the total time to produce this product is 5.33min/piece. To achieve last objective several solution have to discuss with engineer. The result of the solution has be reject because many constraint from factory that can implement in this product. If this solution acceptable the cycle time will reduce about 24s and can reduce operator cost. -Author
650 0 _aWaste minimization
999 _aVIRTUA40
_c730
_d736
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*5200*6500*9992