000 00951nam a2200229 a 4500
001 vtls000030948
003 KUKTEM
005 20251114204349.0
008 080818t2007 my a f m 000 0 eng|d
020 _aTHE0007655(Local)
039 9 _a201905171211
_bfawwaz
_c201107132039
_dVLOAD
_c201004260851
_dida
_c200908141510
_dVLOAD
_y200808181029
_zida84
040 _aUMP
090 _aTS178.5 .S53 2007 rs Thesis
100 0 _aShahfiran Sarifuddin
245 1 0 _aProductivity improvement through line balancing technique in a small medium enterprise (SME) manufacturing plant /
_cShahfiran Bin Sarifuddin
260 _aKuantan, Pahang :
_bUMP,
_c2007
300 _a35 p. :
_bill. ;
_c30 cm.
502 _aProject paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2007
650 0 _aAssembly-line balancing
650 0 _aAssembly-line methods
999 _aVIRTUA40
_c744
_d750
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5020*6500*6501*9992