245 1 0 _aTraffic management during construction :
_bcase study of flyover at Jalan Bukit Ubi, Kuantan /
_cSharmaine Shaari
260 _aKuantan, Pahang :
_bUMP,
_c2017
300 _axiii, 79 p. :
_bill. (some col.), charts ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 _aBibliography : p. 59-61
520 3 _aManaging traffic at the construction area is the crucial part without having risks to health and safety whether it is in short or long term duration. Traffic management includes all physical measures designed to affect the movement of traffic on an existing network including the volume of traffic and the type of vehicles used. This paper present the implementation of traffic management during the construction of flyover at Jalan Bukit Ubi, Kuantan, Pahang. This paper study on what have been applied during the construction of flyover by the contractors, engineers and other construction worker. Also, there will be some changes of lanes, traffic flow etc, due to the construction of flyover. Besides, there will be some traffic congestion during the construction Therefore, traffic counting is conducted during and after the construction of flyover, which both are compared in terms of traffic volume and types of vehicles used. The problems occurred during and after the construction of flyover will be discussed further on this study.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c7480
_d7486
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*9992