000 03248nam a2200361 i 4500
001 vtls000103574
003 KUKTEM
005 20251117113401.0
008 180523s2018 my a f a m 000 0 eng d
020 _aTHE0000706(Local)
039 9 _a201905171006
_bnazirah
_c201805241128
_dfateeha
_c201805231046
_dfateeha
_y201805231035
_zfateeha
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .S93 2018 r Bc.
100 0 _aSiti Nur Syafiqah Mohd Sa'don,
_eauthor.
245 1 0 _aBarriers in the implementation of IBS formwork in Malaysian construction industry /
_cSiti Nur Syafiqah Mohd Sa'don
264 1 _aKuantan, Pahang :
_bUMP,
_c2018
300 _ax, 54 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelor Degree in Civil Engineering) -- Universiti Malaysia Pahang – 2018
504 _aIncludes bibliographical references
520 3 _aNowadays, in Malaysian construction industry, the use of IBS as a method of construction is develop rapidly, but not for this type of IBS; IBS formwork or prefabricated formwork. This research is to focal point the critical factors of implementation the used of Industrialized Building System (IBS) formwork or namely as pre-fabricated formwork system in the Malaysian construction industry. Based on the reviews of a previous research and related literature, this paper was identified five (5) main barriers and challenging criteria that classified as a difficulties to the success of IBS formwork system application; the issues related to product technical limitation, high initial cost & financial barriers, lack incentive & promotion guidance, less product support and lack exposure on IBS formwork were highlight as a key dimension for the uses of IBS formwork system to success. The objective of this paper is to investigate the practice of IBS formwork in Malaysian construction industry, determine barriers in implementation of IBS in Malaysian construction industry and to point out the main barriers in implementation of IBS formwork in Malaysian construction industry. Questionnaires survey was conducted in order to achieve the objectives. The respondents consisted of person who involved in construction project. The data were tabulated using Microsoft Excel and then analyzed using frequency analysis, average index and ranked. In conclusion, the barriers of IBS implementation in Malaysia has been identified and discussed. According to this research, product technical limitation, high initial cost & financial barriers and lack incentive & promotion guidance are the main barriers factor in IBS implementation in Malaysia.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c7751
_d7757
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2640*3000*3360*3361*3370*3371*3380*3381*3470*5000*5020*5040*5200*6100*6500*6501*9992