| 000 | 00823nam a2200253 a 4500 | ||
|---|---|---|---|
| 001 | vtls000090763 | ||
| 003 | KUKTEM | ||
| 005 | 20251125100203.0 | ||
| 008 | 150811t1995 enk f 000 0 eng d | ||
| 020 | _a9780727720320 (pbk.) | ||
| 020 | _a0727720325 | ||
| 039 | 9 |
_a201601191105 _bsafura _y201508111437 _zazli |
|
| 040 | _aUMP | ||
| 090 | _aTA183 .P76 1995 | ||
| 245 | 0 | 0 |
_aProject cost estimating / _cedited by Nigel J. Smith |
| 260 |
_aLondon : _bT. Telford, _c1995 |
||
| 300 |
_a108 p. ; _c22 cm. |
||
| 490 | 1 | _aEngineering management | |
| 504 | _aIncludes bibliographical references | ||
| 650 | 0 |
_aEngineering _xEstimates |
|
| 700 | 1 | _aSmith, Nigel J. | |
| 830 | 0 | _aEngineering management (London, England) | |
| 999 |
_aVIRTUA40 _c78292 _d78298 |
||
| 999 | _aVTLSSORT0080*0200*0201*0400*0900*2450*2600*3000*4900*5040*6500*7000*8300*9992 | ||