000 02781ntm a2200373 i 4500
999 _c7954
_d7960
001 vtls000105631
003 KUKTEM
005 20251117113409.0
008 190419t20182018my a f am 000 0 eng d
020 _aTHE0000386(Local)
_chardback
039 9 _a201905141800
_bnazirah
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .F37 2018 r Bc.
100 0 _aNur Farhana Hamzah,
_eauthor.
245 1 0 _aChallenges and barriers of building information modelling (BIM) implementation in construction industry /
_cNur Farhana Hamzah
264 1 _aKuantan, Pahang :
_bUMP,
_c2018
264 4 _c© 2018
300 _axvi, 90 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018
504 _aIncludes bibliographical references
520 3 _aBuilding Information Modelling (BIM) is an intelligent model-based process that provides insight for creating and managing building and infrastructure projects faster, more economically and with less environmental impact. It also represents the process of development and use of a computer generated model to simulate the planning, design, construction and operation of a facility. BIM is defined as a modelling technology and associated set of processes to produce, communicate, and analyse building models throughout the entire project's lifecycle. Although there is bound of benefits that gained from the BIM application, the local construction industry still reluctant to deploy the technology in delivery its services. The objectives of the study is to identify the types of challenges from relevant literature review related to BIM, to design the questionnaire on the challenges and barriers during the implementation of BIM and to analyse the effect of challenges to the outcome of BIM. The survey questionnaires were distributed in the construction field, consultant firm and architecture firm within Klang Valley. The method of data collection is by questionnaire and also simple interview. The main conclusion drawn from the study are cost, lack of collaborative work processes and modelling standards and fragmented nature are the most largest challenges and barriers in the implementation of BIM in construction industry.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
942 _2lcc
_cTHESIS