000 01025nam a2200253 a 4500
001 vtls000022432
003 KUKTEM
005 20251117113412.0
008 071119t2005 nju f 001 0 eng|d
020 _a0131114654
039 9 _a201107131940
_bVLOAD
_c201103170934
_dida
_c200908141351
_dVLOAD
_c200908141323
_dVLOAD
_y200711191428
_zfarina
040 _aUMP
090 _aTH438.4 .B88 2005
100 1 _aButtelwerth, John
245 1 0 _aComputer integrated construction project scheduling /
_cJohn Buttelwerth
260 _aUpper Saddle River, NJ :
_bPrentice Hall,
_cc2005
300 _axiv, 482 p. :
_bill. ;
_c28 cm. +
_e1 set of 17 technical drawings
500 _aIncludes index
500 _aTechnical drawing available Reference Unit
650 0 _aBuilding
_xSuperintendence
_xData processing
650 0 _aProduction scheduling
_xData processing
856 4 2 _ahttp://www.loc.gov/catdir/toc/ecip0418/2004011896.html
999 _aVIRTUA40
_c8013
_d8019
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5001*6500*6501*8560*9991