000 02997ntm a2200289 a 4500
001 vtls000098148
003 KUKTEM
005 20251117113437.0
008 161123t2016 my a f m 000 0 eng d
020 _aTHE0007812(Local)
039 9 _a201906131130
_bnadia
_c201712141637
_dsaini
_y201611231125
_zfateeha
040 _aUMP
090 _aFKASA .A35 2016 r Bc.
100 0 _aMuhammad Afiq Hasmi
245 1 0 _aBuilding information modeling (clash detection and analysis for architecture & structure discipline in BIM) /
_cMuhammad Afiq Hasmi
260 _aKuantan, Pahang :
_bUMP,
_c2016
300 _axii, 42 p. :
_bcol. ill. ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2016
504 _aBibliography : p. 41-42
520 3 _aBuilding information modelling (BIM) is one of the most promising recent developments in the AEC industry. With BIM technology, an accurate virtual model of a building is digitally constructed. This model, known as a building information model, can be used for planning, design, construction, and operation of the facility. In construction industry, one of the key that lead to the successfully of a project is a good and effective coordination of the time and the cost of the project that can be made during the pre-construction phases where it is called as design phase. In this phases, clash detection in 3D coordination are the most important step that need to be done in this BIM implementation to save an expansive cost of changing construction at site and to avoid the delay of time consuming in construction project. Nowadays, coordinator in Malaysia still rely with 2D construction drawings for all disciplines. This 2D construction drawing generally is been generated by CAD software which are lack of information that are requirement for the coordinator. In clash detection, the processes take a time of finding where the model clash. It means that elements of separate models occupying the same space, or with parameters that are incompatible, or in 4D BIM modelling, a time sequence that is out of order. Finding this inconsistence is vital, as they would severely impact the construction process, causing delays, design changes, materials costs and a cascade of headaches and budget overruns. The methodology of this research are beginning from the collection of raw data of a 2D CAD drawing until it finishes to the last that is the output of the research. The output of this research is the report of clash detection that will run through this research.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
856 4 0 _uhttp://ecollib.ump.edu.my/id/eprint/25581
_zAccess in library only
999 _aVIRTUA40
_c8750
_d8756
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*8560*9992