000 03004ntm a2200289 a 4500
001 vtls000102713
003 KUKTEM
005 20251117113438.0
008 180109t2017 my a f a m 000 0 eng d
020 _aTHE0007865(Local)
039 9 _a201906131112
_bnazri
_c201801181212
_dfateeha
_y201801090940
_zfateeha
040 _aUMP
090 _aFKASA .N338 2017 r Bc.
100 0 _aNabila Jauhari
245 1 0 _aMultidiscipline BIM modeling for administration, library & academic training centre (architectural & structural model) /
_cNabila Jauhari
246 3 _aMultidiscipline BIM modeling for administration, library and academic training centre (architectural and structural model)
260 _aKuantan, Pahang :
_bUMP,
_c2017
300 _ax, 55 p. :
_bill. (some col.) ;
_c30 cm. +
_e1 CD ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 _aBibliography : p. 54-55
520 3 _aArchitects and engineers often rely on drawings and models of their projects to aid in their work. However, 2D computer-aided design (CAD) models don't always provide these professionals with the speed and accuracy they need to complete projects or find solutions to challenges. 3D modeling has been used by architects around the world for many years to improve the efficiency and aesthetic of their designs. Building Information Modeling “BIM” is becoming a better known established collaboration process in the construction industry. Owners are increasingly requiring BIM services from construction managers, architects and engineering firms. With changes in technology, opportunities have been created for industries to become more efficient in the way work is done. 2D drawing has been a normal source of information and procedure since 1970's. On traditional 2D CAD projects, the information flow between the players and project stages is jumbled. Furthermore, the drawings are difficult to interpret. Errors and omissions in paper documents often cause unanticipated field costs, delays, and eventual lawsuits between the various parties in a project team. This study, therefore, aim to evaluate the benefits of BIM to cover and resolve the problems occurred during the conventional method in construction project. The objectives used to achieve the aim are by collect data building and model the 2D cad drawing of the project in 3D model by using REVIT software and compare the traditional conventional construction method with BIM implementation. By using this BIM model approach, researcher believe that it will helps construction project teams for better project coordination in the coming years.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c8791
_d8797
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5000*5020*5040*5200*6100*6500*6501*9992