000 02794ntm a2200289 a 4500
001 vtls000102621
003 KUKTEM
005 20251117113438.0
008 171226s2017 my da f am 000 0 eng d
020 _aTHE0007893(Local)
039 9 _a201906131122
_bnazri
_y201712260958
_zsaini
040 _aUMP
090 _aFKASA .S936 2017 r Bc.
100 0 _aMuhamad Syamim Alias
245 1 0 _aMultidiscipline BIM modelling for administration, library, and academic centre (mechanical & electrical model) /
_cMuhamad Syamim Alias
246 3 _aMultidiscipline BIM modelling for administration, library, and academic centre (mechanical and electrical model)
260 _aKuantan, Pahang :
_bUMP,
_c2017
300 _ax, 50 p. :
_bill. (some col.), charts ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 _aBibliography : p. 44-46
520 3 _aLoss of information and miscommunication in the construction industry are often being related to project completion delays and low quality final products. Therefore, with the advancement of Information Technology, these problems can be reduced by implementing Building information modelling (BIM) approach in the construction industry. Autodesk Revit structure has the BIM feature implemented in the software, which allows information within an interface to be shared by construction players. In addition, by using 3D building model we can clearly visualise the entire project because project visualisation using traditional method normally can lead to misunderstanding problem and conflict between construction players. Aim of this research is to determine whether using BIM model can improve project visualization and collaboration between parties throughout the construction phase in Malaysia. To achieve the aim, 3D model focusing on mechanical and electrical d iscipline was created by using Revit software. From the study, the conflict occur during the construction process can be minimized by using BIM technology. In addition, the time required for completion of the project using BIM is verified and have been compared to conventional method. Lastly, the drafting process using BIM is compared to the conventional method and the result was verified. The accuracy of the model combined with animations and fly- through allow contractors to access the design layout before the build takes place and make alterations.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c8792
_d8798
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2460*2600*3000*5000*5020*5040*5200*6100*6500*6501*9992