000 02593ntm a2200277 a 4500
001 vtls000102627
003 KUKTEM
005 20251117113438.0
008 171226s2017 my da f am 000 0 eng d
020 _aTHE0007879(Local)
039 9 _a201906131117
_bnazri
_y201712261428
_zsaini
040 _aUMP
090 _aFKASA .Q77 2017 r Bc.
100 0 _aNur Qurratu’ain Rusman
245 1 0 _a3D-BIM electrical model updates for construction of MBKT Tower project /
_cNur Qurratu’ain Rusman
260 _aKuantan, Pahang :
_bUMP,
_c2017
300 _ax, 61 p. :
_bill. (some col.), charts ;
_c30 cm. +
_e1 CD-ROM
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2017
504 _aBibliography : p. 47-48
520 3 _aDuring early stage of design and construction phase, there are some potential that conflicts may arise between building components. Problem occur about clashes of Electrical elements with other elements in construction such as Architectural elements, Structural elements, Plumbing items and etc. Revise 2D drawing by using traditional method have poor visualization and make it difficult to make design changes and the changes need to be done in every views. Within the last decade, building information modelling (BIM) has emerged as a potential solution to these problems. BIM allow the designers to view the building and its contents from all angles, and revealing problems at earlier stages to allow for correction without costly change orders. Electrical BIM Services allow the developing highly precise 3D Electrical coordinated models that aid to reduce conflicts and provide better 3D visualization and walkthrough of electrical design. This research will only focusing on 3D Model updates of electrical components in MBKT Tower in Terengganu. Research method that been used in this study is extracted electrical building component information about its measurement and takeoff by using Revit Suite 2015 software. This research are basically based on the case study and all data that was collected from real construction project. By using this BIM model approach, researcher believe that it will helps construction project teams for better project coordination in the coming years.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _aTheses
999 _aVIRTUA40
_c8794
_d8800
999 _aVTLSSORT0080*0200*0400*0900*1000*2450*2600*3000*5000*5020*5040*5200*6100*6500*6501*9992