| 245 | 1 | 0 |
_aImpact of the cost overrun factors on the project delays in construction industry / _cNoor Elinah Sailin |
| 264 | 1 |
_aKuantan, Pahang : _bUMP, _c2019 |
|
| 264 | 4 | _c© 2019 | |
| 300 |
_axi, 53 pages : _billustrations ; _c30 cm. + _e1 CD-ROM |
||
| 336 |
_atext _2rdacontent |
||
| 336 |
_2text _ardacontent |
||
| 337 |
_aunmediated _2rdamedia |
||
| 337 |
_acomputer _2rdamedia |
||
| 338 |
_avolume _2rdacarrier |
||
| 338 |
_acomputer disc _2rdacarrier |
||
| 347 |
_atext file _bPDF _2rda |
||
| 500 | _aFaculty of Civil Engineering and Earth Resources | ||
| 502 | _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019 | ||
| 504 | _aIncludes bibliographical references | ||
| 520 | 3 | _aDelays and cost overruns are evidently frequent problems in the construction industries of many developed and developing countries. Cost saving and time performances are usually essential to all parties who are involved in a construction project that is owner, contractor, and subcontractor. The main causes of disputes in construction projects involve delay and failure to complete the work in the specified cost and time frame. The purpose of this study is to assess factors leading to time overruns (delays) and cost overruns in construction projects in the Malaysia. A total of 36 factors were identified from previous studies. The data collections were carried out using structured questionnaire survey. 50 respondents from the construction industry in Malaysia participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay).The results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry. | |