000 02537ntm a2200373 i 4500
999 _c90815
_d90821
003 MY-KuUP
005 20251125105359.0
006 t||||fr|||| 000 0
007 ta
008 191008t20192019my a|||f |||| 000 0 eng d
020 _aTHE0008100(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .E45 2019 r Bc.
100 1 _aNoor Elinah Sailin,
_eauthor.
245 1 0 _aImpact of the cost overrun factors on the project delays in construction industry /
_cNoor Elinah Sailin
264 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 4 _c© 2019
300 _axi, 53 pages :
_billustrations ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _2text
_ardacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aDelays and cost overruns are evidently frequent problems in the construction industries of many developed and developing countries. Cost saving and time performances are usually essential to all parties who are involved in a construction project that is owner, contractor, and subcontractor. The main causes of disputes in construction projects involve delay and failure to complete the work in the specified cost and time frame. The purpose of this study is to assess factors leading to time overruns (delays) and cost overruns in construction projects in the Malaysia. A total of 36 factors were identified from previous studies. The data collections were carried out using structured questionnaire survey. 50 respondents from the construction industry in Malaysia participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay).The results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDissertations
650 0 _aUniversities and Colleges
_xDissertations
650 0 _xTheses
942 _2lcc
_cPSM