000 02522nam a22003617a 4500
999 _c90820
_d90826
003 MY-KuUP
005 20251125105359.0
007 ta
008 191009t20192019my a|||| |||| 00| 0 eng d
020 _aTHE0008198(Local)
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .M64 2019 r Bc.
100 0 _aMohamad Nazren Izzudin Mohd Zainudin,
_eauthor.
245 1 0 _aProcess flow for electrical as-built building information modelling (BIM) model :
_ba case study of podium for office building /
_cMohamad Nazren Izzudin Mohd Zainudin
264 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 4 _a© 2019
300 _ax, 63 pages :
_bIllustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _2rdacontent
_atext
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
337 _2rdamedia
_acomputer
338 _2rdacarrier
_avolume
338 _2rdacarrier
_acomputer disk
347 _2rda
_atext file
_bPDF
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aNowadays, the management of information throughout a building’s lifecycle is becoming increasingly important and building information modelling (BIM) is often to ensure the interoperability of data. In BIM, there is 5 major disciplines which are Architecture model, Structure model, Mechanical model, Electrical model and Plumbing model. For this research, the focusing is on data management and as built drawings for Electrical model. Basically, data management is important to present the information of the components existing in the building. It will expose to parties some related information that easily to be reviewed. By utilizing BIM, the correct information after post construction can be reviewed more efficient as parties are using the same software which is Autodesk Revit. Conventional method normally the parties only involved in 2D drawings, a lot of spread sheets regarding to the information of components in the building, but we transform to 3D with details information inserted that the parties easily to review. By using BIM model approach, researcher believe that it will help the construction industries and minimize miscommunication among parties in coming years.
610 2 0 _aFaculty of Civil Engineering & Earth Resources
650 0 _aDissertations
_xUniversities and colleges
650 0 _aTheses
942 _2lcc
_cRESTRICT