| 000 | 02631nam a22003617a 4500 | ||
|---|---|---|---|
| 999 |
_c90899 _d90905 |
||
| 003 | MY-KuUP | ||
| 005 | 20251125105406.0 | ||
| 007 | ta | ||
| 008 | 191016t20182018my a|||| |||| 00| 0 eng d | ||
| 020 | _aTHE0008229(Local) | ||
| 040 |
_aUMP _beng _cUMP _erda |
||
| 090 | _aFKASA .Z87 2018 r Bc. | ||
| 100 | 0 |
_aZuriani Halwa Abdullah, _eauthor. |
|
| 245 | 1 | 0 |
_aFlood forecasting modelling using artificial neural network (ann) in Chukai Kemaman / _cZuriani Halwa Abdullah |
| 264 | 1 |
_aKuantan, Pahang : _bUMP, _c2018 |
|
| 264 | 4 | _a© 2018 | |
| 300 |
_axi, 34 pages : _bIllustrations (some color) ; _c30 cm. + _e1 CD-ROM |
||
| 336 |
_2rdacontent _atext |
||
| 336 |
_2rdacontent _atext |
||
| 337 |
_2rdamedia _aunmediated |
||
| 337 |
_2rdamedia _acomputer |
||
| 338 |
_2rdacarrier _avolume |
||
| 338 |
_2rdacarrier _acomputer disc |
||
| 347 |
_2rda _atext file _bPDF |
||
| 500 | _aFaculty of Civil Engineering and Earth Resources | ||
| 502 | _aProject Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2018 | ||
| 504 | _aIncludes bibliographical references | ||
| 520 | 3 | _aFlood has a big potential to obliterate away an entire city, area or coastline and can cause substantial damages to life and properties. Flood is the most intense and the only natural disaster happens in Malaysia. Floods occur when the amount of water flowing from a catchment surpass the capacity of its drains, creeks, and rivers. This process begins with rainfall, but is an affected by many other factors. Flood can happen at any time of the year and are caused by heavy rainfall or non-stop rainfall. Hence, flood forecasting is requiring providing better warning for people. Artificial Neural Network (ANN) is used to develop accurate flood forecasting modelling. ANN is chosen to be use because of its simplicity, easy implementation and demonstrated success in forecasting studies, since ANN have been found to be powerful tools for solving different problems in variety of applications. Artificial Neural Network (ANN) also can be used to develop accurate flood forecasting modelling. This study is based on predicting flood event at Chukai, Kemaman, Terengganu. In Terengganu, flood happen due to monsoon rainfall and cause of backwater phenomenon during high tides. The hourly water levels for 20 to 30 years are needed to develop flood forecasting. The hourly water level data can be taken from the Department of Irrigation and Drainage (DID), Malaysia. | |
| 610 | 2 | 0 | _aFaculty of Civil Engineering and Earth Resources |
| 650 | 0 |
_aDissertations _xUniversities and colleges |
|
| 650 | 0 | _aTheses | |
| 942 |
_2lcc _cRESTRICT |
||