000 03534ntm a2200373 i 4500
999 _c90908
_d90914
003 MY-KuUP
005 20251125105406.0
006 t||||fr|||| 000 0
007 ta
008 191017t20182018my a|||fram|| 000 0 eng d
020 _aTHE0008149(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .Z36 2018 r Bc.
100 0 _aNor Ain Zamiza Ahmad Salhar,
_eauthor.
245 1 0 _aFactor hindering the implementation of qlassic in Malaysian construction industry /
_cNor Ain Zamiza Ahmad Salhar
264 1 _aKuantan, Pahang :
_bUMP,
_c2018
264 4 _c© 2018
300 _axi, 45 pages :
_billustrations ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2018
504 _aIncludes bibliographical references
520 3 _aCIDB has introduced Quality Assessment System in Construction (QLASSIC) in 2006 to help increasing the quality of building in Malaysia. After more than 10 years QLASSIC has been introduced, there are still many developers and contractors unfamiliar with QLASSIC. This has led to the main objective of conducting this research, namely to identify the factor hindering the implementation of QLASSIC in Malaysia. This research had utilized questionnaire form as the research instrument. The respondents for this research were construction personnel from developer’s company and contractor’s company. The data collected were then analyzed by using Relative Importance Index (RII). The research outcomes can provide understanding in the principle and concept of QLASSIC, list of factors hindering the implementation of QLASSIC and lastly analysis of the most significant factor hindering the implementation of QLASSIC in Malaysia. In general, this research revealed five factors hindering the implementation of QLASSIC in Malaysia. The factors were advertisement efficiency, time constraint, cost constraint, behavior of construction player and insufficient skilled worker. In addition, this research shown that the most crucial factor hindering the implementation of QLASSIC in Malaysian construction industry was the behavior of construction player. The behavior of construction players included resist to adopt new approach, reluctant to attend any training to enhance their knowledge in QLASSIC, reluctant to change, construction player tend to reduce the perceived risk in adopting a new approach and a new approach will create a new role so they afraid it will take their role. The most crucial factor hindering the implementation of QLASSIC in Malaysia then was followed by time constraint factor, advertisement efficiency factor, cost constraint factor and insufficient skilled worker factor. In a nutshell, government has to make a new strategy to address this issue if government wants to see the construction industry in Malaysia able to compete globally and Malaysian construction players such as developers and contractors must change their behavior by be more open with new approaches suggested by government.