| 000 | 02846nam a22003617a 4500 | ||
|---|---|---|---|
| 999 |
_c91009 _d91015 |
||
| 003 | MY-KuUP | ||
| 005 | 20251125105415.0 | ||
| 007 | ta | ||
| 008 | 191029t20182018my a|||| |||| 00| 0 eng d | ||
| 020 | _aTHE0008263(Local) | ||
| 040 |
_aUMP _beng _cUMP _erda |
||
| 090 | _aFKASA .H556 2018 r Bc. | ||
| 100 | 0 |
_aMohamad Hilmi Hamizan, _eauthor. |
|
| 245 | 1 | 0 |
_aExploration on traffic characteristics and gap assessment on midblock u-turn facilities / _cMohamad Hilmi Hamizan |
| 264 | 1 |
_aKuantan, Pahang : _bUMP, _c2018 |
|
| 264 | 4 | _a© 2018 | |
| 300 |
_axi, 52 pages : _bIllustrations (some color) ; _c30 cm. + _e1 CD-ROM |
||
| 336 |
_2rdacontent _atext |
||
| 336 |
_2rdacontent _atext |
||
| 337 |
_2rdamedia _aunmediated |
||
| 337 |
_2rdamedia _acomputer |
||
| 338 |
_2rdacarrier _avolume |
||
| 338 |
_2rdacarrier _acomputer disc |
||
| 347 |
_2rda _atext file _bPDF |
||
| 500 | _aFaculty of Civil Engineering and Earth Resources | ||
| 502 | _aProject Paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2018 | ||
| 504 | _aIncludes bibliographical references | ||
| 520 | 3 | _aThe idea of a Midblock U-turn Opening installation is to eliminate direct right turns. Midblock U-turning facilities are median openings on multi-lane highways. Uturning facilities aimed at easing traffic conflicts and pressures at highway intersections. This study is to identify the influence of midblock U-turn facilities towards traffic parameters of speed, flow and density relationship and to determine the safe merging gap for the midblock U-turn facilities. This study is referring to unsignalized junction, that is the midblock U-turn facilities located at Jalan Tanah Putih, heading to Kuantan, Pahang. The traffic characteristics of this study is to define the speed, flow and density when the vehicle at free flow speed and when reaching the conflict point near the midblock U-turn facilities. Raff’s Method is the method used to analysed the critical gap for the passenger car that want to make a U-turn. By using Raff Method, the gap acceptance and gap rejected will be observe and from these data, it can produce a linear graph which can determined the critical gap. The result obtained showed the traffic characteristics relationship which is speed, flow and density that the data relationship was similar to Greenshield Model and critical gap of the U-turn was 5.0 second. The critical gap was comply with the standard of Malaysia Public Work Department and Transportation Research Board. The result show from the speed, flow and density relationship, the road was in a good condition and the drivers behavior that desire to merge into major road from the U-turn. | |
| 610 | 2 | 0 | _aFaculty of Civil Engineering and Earth Resources |
| 650 | 0 |
_aDissertations _xUniversities and colleges |
|
| 650 | 0 | _aTheses | |
| 942 |
_2lcc _cPSM |
||