000 02550nam a22003377i 4500
999 _c92100
_d92106
003 MY-KuUP
005 20251125105524.0
006 a||||fr|||| 001 0
007 ta
008 200227t20192019my ||||f ma|| 001 0 eng d
020 _aTHE0008531(Local)
040 _aUMP
_beng
_cUMP
_erda
090 _aFIM .A36 2019 r Thesis
100 0 _aAdnan Ali Mohammed Alghail,
_eauthor.
245 1 2 _aA novel project management maturity model by integrating knowledge management capabilities :
_bempirical evidence from institutions of higher education in Yemen /
_cAdnan Ali Mohammed Alghail
264 0 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 _a© 2019
300 _axiii, 255 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Industrial Management
502 _aThesis (Doctor of Philosophy) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aA rise in knowledge management has gradually become an essential support to many organizations to reach to their target project management maturity. Most of Yemen’s organization projects failed to deliver the expected service/product due to the lack of integration of the management of knowledge with project management. This study reveals the integration of knowledge management capabilities into project management by developing a novel assessment model. The model was used to examine project management maturity in higher education institutions. A number of 352 respondents, such as project managers and other project members from 10 public universities located in the north and south geopolitical zone of Yemen participated in this study. The result shows that the project knowledge management capabilities are considered as a way of identifying the level of maturity in project management, except the project-based organizational structure and project knowledge conversion capability, where they should have more support and attention by the higher education institutions. Overall, the project management maturity level of the universities in the public sector is 3.1 out of 5, which indicates that the knowledge management capabilities, project management tools and methods have not yet been used effectively in Yemen.
610 2 0 _aFaculty of Industrial Management
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
942 _2lcc
_cTHESIS