000 02980ntm a2200373 i 4500
999 _c92428
_d92434
003 MY-KuUP
005 20251125105544.0
006 t||||fr|||| 000 0
007 ta
008 200701t20192019my a|||fram|| 000 0 eng d
020 _aTHE0008684(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .M56 2019 r Bc.
100 0 _aMimi Ereena Solahudin Alayubi,
_eauthor.
245 1 0 _aFactors that contribute to delay in construction project in Johor /
_cMimi Ereena Solahudin Alayubi
264 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 4 _c© 2019
300 _ax, 74 pages :
_billustrations ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aThis research aim to identify the factors that causes of delays in construction project in Johor. To achieve this aim, 2 objective have been identified which is to identify the factors that causes of delay in construction project and to propose recommendation to overcome the delay in construction project. The research was focus on study the causes of delay in construction project based on contractor-related, consultant-related, client-related categories in Johor, Malaysia. The scope of the research is mainly focus on literature review and a questionnaire survey. The questionnaire survey was designed based on the causes of construction delays, effects of construction delays and the methods of minimizing the construction delays. The respondent involved in this research is contractor, consultant, and client. Through the literature review, 11 factors were selected for contractor related, 8 factors were selected for consultant related and 7 factors were selected for client related. A set of questionnaire were prepared which consist of three sections. Out of 150 respondent targeted only 104 respondent had completely answered the survey that had been distributed by hand, e-mail and link using online survey. The data was analysed using Average Index method and each factor was ranked. From the data analysis, delay in approving major changes of work by consultant is the highest average index that contribute to the causes of delay with average index value is 4.221 under the scale ‘Agree’. For method to minimize delay in construction project, most of the respondent agree on effective strategic planning which has the highest value of average index which is 4.462.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDisertations
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
942 _2lcc
_cPSM