000 02818ntm a2200373 i 4500
999 _c92444
_d92450
003 MY-KuUP
005 20251125105545.0
006 t||||fr|||| 000 0
007 ta
008 200702t20192019my a|||fram|| 000 0 eng d
020 _aTHE0008692(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .W37 2019 r Bc.
100 1 _aAbdulwasea Al-Malik, Mohammed Abdullah Saeed,
_eauthor.
245 1 0 _aIdentifying the critical success factors of BIM implementation in Malaysia /
_cMohammed Abdullah Saeed Abdulwasea Al-Malik
264 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 4 _c© 2019
300 _axi, 57 pages :
_billustrations ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aBuilding Information Modelling (BIM) is one of modern technology that promising a lot of benefits towards architecture, engineering and construction (AEC) industries. The potential of BIM will improve overall in the construction performance in term of cost effectiveness, increase quality of project and reduce time to develop the project. It helps architects, engineers, clients, and constructors to visualize what is to be built in through a 3D model and identify potential design, construction or operational problems. In Malaysia, BIM has introduced to AEC industry by public work department(PWD) since 2007, but the rate of implementing BIM is still very low within construction projects. Thus, this study is focusing in identifying the critical success factors for enhancing BIM implementation in Malaysia. To achieve the aim of the study, related objective been set which are study the current situation of BIM adoption in the construction industry, level of awareness among stakeholders and identify CSFs for implementing of BIM. Factors have been identified through literature review and modified by pilot study to suit the situation in Malaysia. These CSFs are classified into four categories are management, process, people, and technology. Consequently, data analysis has done to identify the most critical success factors that play a main role in enhancing implementation of building information modelling by using relative importance index (RII) analysis method.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDisertations
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
942 _2lcc
_cRESTRICT