000 02734ntm a2200373 i 4500
999 _c92613
_d92619
003 MY-KuUP
005 20251125105555.0
006 t||||fr|||| 000 0
007 ta
008 200714t20192019my a|||fram|| 000 0 eng d
020 _aTHE0008749(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFKASA .A455 2019 r Bc.
100 0 _aNur Aliya Najiha Tamrin,
_eauthor.
245 1 0 _aCauses of project delay and cost overrun of mega projects in peninsular Malaysia /
_cNur Aliya Najiha Tamrin
264 1 _aKuantan, Pahang :
_bUMP,
_c2019
264 4 _c© 2019
300 _ax, 58 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering and Earth Resources
502 _aProject Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2019
504 _aIncludes bibliographical references
520 3 _aProject delay and cost overrun are two most commonly issues happen which tend to cause troubles in any construction project, especially the mega construction project. These two issues are generally regarded as the most problematic, complex, and risky issues encountered in a mega construction project. Many studies in Malaysia and also from the other countries point out that the issue of project delay and cost overrun are most commonly happen in developing countries includes Malaysia. Therefore, the identification or establishment of the causes that will lead to project delay and cost overrun in megaprojects is necessary and vital in order to put an effort in avoiding or overcoming this problem. This is corresponds to the main objective of this study which is to study the causes of the project delay and cost overruns in megaprojects in Peninsular Malaysia. The data acquired from the survey used a Likert Scale and analysed using Relative Important Index (RII).The study found that the three highest ranking for the causes of project delay of megaprojects by overall respondents are mistakes during construction by contractors, delay in progress payment and financial difficulties. While the causes of cost overrun for megaprojects declaring the three highest ranking is from the aspect of site management which are schedule delay, inaccurate time and cost estimated and inadequate monitoring and controlling.
610 2 0 _aFaculty of Civil Engineering and Earth Resources
_xDisertations
650 0 _aUniversities and colleges
_xDisertations
650 0 _aTheses
942 _2lcc
_cPSM