000 05058ntm a2200373 i 4500
999 _c94671
_d94677
003 MY-KuUP
005 20251125105758.0
006 t||||fr|||| 000 0
007 ta
008 201105t2 2 m a|||fram|| 000 0 eng d
020 _aTHE0008963(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aKK .I58 2020 r Thesis
100 0 _aIntan Bazliah Mohd,
_eauthor.
245 1 0 _aDeveloping an integrated model between QFD and AHP for assembly line :
_bcase study at an electronic company /
_cIntan Bazliah Mohd
264 1 _aKuantan, Pahang :
_bUMP,
_c2020
264 4 _c© 2020
300 _axvi, 212 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aCollege of Engineering
502 _aThesis (Doctor of Philosophy) -- Universiti Malaysia Pahang – 2020
504 _aIncludes bibliographical references
520 3 _aThe lean assembly line refers to a solution or a suggestion that is able to minimise cycle time for a daily basis working period. There is no specific method; it will take a look at the production lines from first till the end of line to observe where the problems are. Despite the broad efforts that have been made to make the lean production system more reasonable, however, the status of the current achievement of lean practices and lean continuous improvement strategies by Malaysian industry has not been analysed extensively. Thus, the objectives of the present research are to investigate which lean practices and lean continuous improvement strategies are important to the Malaysian manufacturing industry and how significant the difference between priority and current achievement. Moreover, the research was carried out to develop a lean hierarchical function deployment model for assembly line performance improvement and to propose lean assembly line model best practices for production operation system using simulation analysis. Survey and case study approaches were chosen in this research. In investigating the level achieved and factors of the lean practices (LP) and lean improvement strategies (LS), a set of questionnaire has been developed based on the parameters from the literature. The Lean Hierarchical Function Deployment (LHFD) model is based on Analytic Hierarchy Process (AHP) and Quality Function Deployment (QFD); where AHP was originally developed for making the decision making for the complex problem; while QFD was developed for the design of process and development. This LHFD methodology was focused and elaborated more on the extended AHP and QFD used for finding the relationship between lean assembly line and lean continuous improvement strategies. In this research, the survey data from 61 manufacturing firms in Malaysia were used to confirm the status of lean implementation among manufacturing firms and the significant relationship between all parameters in general. Meanwhile, a case study was performed in an electrical product assembly firm to reconfirm the lean assembly essential parameter using LHFD model. The findings showed that there are four main criteria can be categorised for lean practices which is shortening process time (SPT), man and machine use (MMU), inventory and storage control (ISC) and workspace optimisation (WO). Besides, method of improvement, improve workstation layout and production time saving tricks are three main lean continuous improvement strategies that most potential effect on the four categorised of above mentioned lean practices in the assembly line performance improvement. The modelling and simulation analysis found that different types of strategies had contributed different end result. The method of improvement requires specific knowledge and working experience in the workstation meanwhile, using about the time saving tricks need creativity of a line supervisor to alter or re-arrange the job specification and working time. To improve workstation layout, it focuses on the workspace reduction through minimising of work on progress product transportation time. These findings have significant implication, theoretically and practically for translating the strategy and policies on preparing the deployment approach as a sub activity in the LHFD model, especially to absorb any changes or uncertainty in productivity issues. The other researchers, industrial practitioners, government and local authority can refer the proposed framework to understand the diverse effects of the integration of lean practice and the strategies, as well as to identify the strength and weaknesses in setting the policies to achieve the basis of performance improvement implementation for lean assembly line.
610 2 0 _aCollege of Engineering
_xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aTheses
942 _2lcc
_cTHESIS