000 04733nam a2200349 i 4500
999 _c96297
_d96303
003 MY-KuUP
005 20251125105945.0
006 a||||fr|||| 001 0
007 ta
008 220223t20212021my a|||fram|| 001 0 eng d
020 _aTHE0009213(Local)
040 _aUMP
_beng
_cUMP
_erda
090 _aFTKA .Z34 2021 r Thesis
100 0 _aZahrizan Zakaria,
_eauthor.
245 1 3 _aAn empirical investigation the adoption factors of building information modelling (BIM) from the perspective of Malaysian Civil And Structure Consultant Firms /
_cZahrizan Zakaria
264 1 _aKuantan, Pahang :
_bUMP,
_c2021
264 4 _a© 2021
300 _axiii, 210 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
338 _avolume
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering Technology
502 _aThesis (Doctor of Philosophy in Civil Engineering Technology) -- Universiti Malaysia Pahang – 2020
504 _aIncludes bibliographical references
520 3 _aThe construction industry in the Fourth Industrial Revolution (IR 4.0) have to focus on high-technology jobs such as technological skill rather than labour-intensive approach and low-skilled job. But, most of the construction industries in Malaysia are using traditional approach which is labour-intensive approach and it has resulted in fragmentation issue among the project participants resulting less productivity and inefficiency in delivering the project. In order to tackle this issue, Building Information Modelling (BIM) can offer a platform to integrate between different parties in the construction industry. It also offers a lot of benefits to construction industry in term of productivity and efficiency. Even though there are a lot of benefits that can be gained by BIM utilisation and many efforts to increase the adoption of BIM in construction projects such as conducting the seminars, workshops and incentives but, the rate of BIM adoption by the Malaysian construction players is still low compared to other Asians countries. Therefore, there is a need to study the adoption factors within Malaysian construction industry that could facilitate the pace of BIM adoption in Malaysia especially from the perspective of civil and structure (C&S) consultant firms. Several studies had explored the way to increase the pace of BIM adoption from the perspective of architectures, facilities management, quantity surveyor and contractors, and very little effort to identify the adoption factors and its relationship that could facilitate the adoption of BIM especially from the perspective of C&S consultant firms. C&S consultant firm plays a vital role to ensure the design is constructible, operable and maintainable. Thus, the aim of this study is to examine the relationship between organizations, people and technology towards making decisions in adopting BIM from the perspective C&S consultant firm. In this study, qualitative and quantitative approaches have been utilised as research method to develop in-depth understanding of the happening by obtaining the views on the subject studied especially the current application of BIM in the Malaysian construction industry. At the same time, this study is conducted to explore what are the factors that affecting the adoption of BIM in the Malaysian construction industry. Lack of national guideline for implementing BIM, pressure from clients or governments and lacking of technical support from BIM experts are the vital challenges faced by the adopters besides having a higher cost of early investment in BIM technology. Analysis from multiple linear regression revealed the factors that have a strong relationship in influencing organisation to adopt BIM are; having a strong support from the top management, having a coercive pressure, having a clear BIM implementation plan, undergo training, having a BIM competency team, having a clear job specification for new roles, BIM technology must free from interoperability issue, less cost of technology, and the issue of compatibility. This study offers a new insight from the perspective of C&S consultant firms on the adoption of BIM and could improve the rate of BIM adoption. At the same time, it could fill the gap from previous studies by extending the study of BIM adoption by investigating from C&S consultant firm’s point of view and it complementing the overall view of BIM adoption from all participants.
610 2 0 _aFaculty of Civil Engineering Technology
_xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aTheses
942 _2lcc
_cTHESIS