000 04215ntm a2200361 i 4500
999 _c96384
_d96390
003 MY-KuUP
005 20251125105951.0
006 t||||fr|||| 000 0
008 220315s2021 my a|||frm||| 00| 0 eng d
020 _aTHE0009160(Local)
_qhardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFTKA .Z66 2021 r Thesis
100 1 _aNg Zone Fhong,
_eauthor.
245 1 0 _aDelineation of flood inundation extent as the result of land use changes in Kuantan River Basin /
_cNg Zone Fhong
264 1 _aKuantan, Pahang :
_bUMP,
_c2021
264 4 _c© 2021
300 _aiv,138 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD ROM
336 _atext
_2rdacontent
336 _atext
_2rdacontent
337 _aunmediated
_2rdamedia
337 _acomputer
_2rdamedia
338 _avolume
_2rdacarrier
338 _acomputer disc
_2rdacarrier
347 _atext file
_bPDF
_2rda
500 _aFaculty of Civil Engineering Technology
502 _aThesis (Master of Science) -- Universiti Malaysia Pahang – 2021
504 _aIncludes bibliographical references
520 3 _aFlood is undoubtedly the most devastating natural disaster in Malaysia. Flood induced problems such as loss of life, property damages, and infrastructure disruptions have distressed the local authorities and government agencies in Malaysia including the Kuantan District. One of the worst floods that occurred in Kuantan took place in December 2013 which was caused by extreme monsoon rain. This massive flood resulted in the evacuation of around 14,044 people and major damages to the electricity, road structure, buildings, and properties. Although flood event happens in a yearly basis in the Kuantan River Basin (KRB), there are still lack of flood risk management studies conducted in this region. Hence, a comprehensive flood study, especially the generation of flood inundation map (FIM) in (KRB) is highly needed for the future urban planning purpose. This study aims to simulate the flood hydrograph based on extreme rainfall events, and to develop the FIM for KRB. Watershed and river networks of the KRB were delineated from the Shuttle Radar Topography Mission Digital Elevation Model (SRTMDEM) with a resolution of 30 m using ArcGIS application. ArcGIS integrated application, the Geospatial Hydrologic Modelling Extension (HEC-GeoHMS) was used to extract the hydrological parameters as the input for the hydrological modelling. For the rainfall-runoff analysis, the SCS Unit Hydrograph transformation method and SCSCN loss method were implemented in the Hydrologic Modelling System (HEC-HMS). Runoff results from the hydrological model were then applied in the 1D-2D River Analysis System (HEC-RAS) for the unsteady-flow simulation to simulate and predict the river water level and overbank flow which were subsequently used to generate FIM. The flood hydrographs that have been simulated from the hydrological modelling was compared with the observed data. After the process of calibration and validation, it was noted that the simulation produced the same pattern of flow discharge to the observed with an average Nash Sutcliffe efficiency, NSE of 0.641 and Root Mean Square Error, RMSE of 70.9 m³/s. For the result of the 1D hydraulic modelling, it indicates that the water levels simulated at the upstream and downstream of the Kuantan river was fitted with the observed levels with an average E of 0.716 and RMSE of 0.493 m. Meanwhile, for the 2D hydraulic modelling, the generated flood inundated areas in the year 2013 demonstrates almost 70% similarity to the observed flood areas. The flood extent using land use in year 2013 is almost 50% larger compared to that in year 2010 . Based on the modelling analysis and outcome, it can be concluded that generation of flood hydrograph and flood inundation extent is sufficient by SRTM-DEM in hydrological and hydraulic modelling.
610 2 0 _aFaculty of Civil Engineering Technology
_xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aTheses
942 _2lcc
_cTHESIS