000 03465ntm a2200373 i 4500
999 _c99538
_d99544
003 MY-KuUP
005 20251125110740.0
006 t||||fr|||| 000 0
007 ta
008 230612t20232023my a|||fr|||| 000 0 eng d
020 _aTHE0009658 (Local)
_qHardback
040 _aUMP
_beng
_cUMP
_erda
090 _aFIM .F37 2023 r Thesis
100 1 _aSiti Nur Farhain Binti Mohd Yusri,
_eauthor.
245 1 0 _aOvercoming causes of claim disputes in construction projects: a dematel based model /
_cSiti Nur Farhain Binti Mohd Yusri
264 1 _aKuantan, Pahang :
_bUMP,
_c2023
264 4 _c©2023
300 _axi, 107 pages :
_billustrations (some color) ;
_c30 cm. +
_e1 CD-ROM
336 _2rdacontent
_atext
336 _2rdacontent
_atext
337 _2rdamedia
_aunmediated
337 _2rdamedia
_acomputer
338 _2rdacarrier
_avolume
338 _2rdacarrier
_acomputer disc
347 _2rda
_atext file
_bPDF
500 _aFaculty of Industrial Management
502 _aThesis (Master of Science) -- Universiti Malaysia Pahang – 2023
504 _aIncludes bibliographical references
520 3 _aClaim disputes are inevitable as construction projects are renowned for being extremely complicated and loaded with risk and necessitate long-term collaboration among a variety of parties. Previous studies have only investigated the causes and effects of claim disputes in the construction sector; little have investigated the relationship between the different factors of causes and less on proposing strategies to overcome claim disputes. The aim of this study is to analyse the main causes of claim disputes in construction projects, and to propose strategies to avoid claim disputes in construction projects by adopting mixed method research that combines qualitative and quantitative data which utilizes DEMATEL method of data analysis by exploring the relationships between those factors. A list of causes and strategies for the study was produced from a review of the relevant literatures, with sixteen (16) causes and nine (9) strategies were retrieved. The approach known as Decision-Making Trial and Evaluation Laboratory, or DEMATEL, was applied to construct a causal relationship between the factors of causes and strategies with the goal of better comprehending these dynamics and finding effective ways to address them. According to the data obtained from thirteen (13) respondents, the primary contributing causes of claim disputes in construction projects are project cost underestimation (C7), poor communication among the parties (C15), contract violation (C4), contract misinterpretation (C5), contractor's financial difficulties (C3), variation order due to client's new requirements (C8), conflicting drawings and specifications (C14), and omissions and errors in design (C13). On the other hand, five (5) most significant strategies to overcome claim disputes in construction projects are RFI Procedure (S6), clarity of contract language (S2), effective communication (S3), Critical Path Method (CPM) (S8), and joint recognition of changes (S5). The findings of this study can provide significant assistance in developing a plan to effectively handle the issue of claim disputes that exists within the industry for the stakeholders in the construction sector and also, the government.
610 2 0 _xDissertations
650 0 _aUniversities and colleges
_xDissertations
650 0 _aThesis
942 _2lcc
_cTHESIS