The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Bhd. /
Najibah Anuar
The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Bhd. / Najibah Anuar - Kuantan, Pahang : UMP, 2012 - xiv, 53 p. : ill. (some col.) ; 30 cm.
Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
Bibliography : p. 51-52
THE0007489(Local)
Production management
Production control
Industrial productivity
The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Bhd. / Najibah Anuar - Kuantan, Pahang : UMP, 2012 - xiv, 53 p. : ill. (some col.) ; 30 cm.
Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
Bibliography : p. 51-52
THE0007489(Local)
Production management
Production control
Industrial productivity