The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn. Bhd. / Najibah Anuar

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2012Description: xiv, 53 p. : ill. (some col.) ; 30 cmISBN:
  • THE0007489(Local)
Subject(s): Dissertation note: Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB PEKAN TS155 .N35 2012 rs Bc. (Browse shelf(Opens below)) 1 Not for loan 0000067375

Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012

Bibliography : p. 51-52

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us