Cost estimation of remanufacturing crankshaft by integrating mahalanobis-taguchi system and activity-based costing /

Ezza Elyana Mohamad Nor

Cost estimation of remanufacturing crankshaft by integrating mahalanobis-taguchi system and activity-based costing / Ezza Elyana Mohamad Nor - Kuantan, Pahang : UMP, 2017 - xiii, 113 p. : ill. ; 30 cm.

Faculty of Manufacturing Engineering

Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2017

Includes bibliographical references

THE0005329(Local)


Faculty of Manufacturing Engineering--Dissertations


Universities and Colleges--Dissertations
Theses

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us