Cost estimation of remanufacturing crankshaft by integrating mahalanobis-taguchi system and activity-based costing / Ezza Elyana Mohamad Nor
Material type:
TextPublication details: Kuantan, Pahang : UMP, 2017Description: xiii, 113 p. : ill. ; 30 cmISBN: - THE0005329(Local)
| Item type | Current library | Call number | Copy number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|---|
Final Year Report
|
UMPLIB PEKAN | FKP .E99 2017 r Bc. (Browse shelf(Opens below)) | 1 | Not for loan | 0000119186 |
Faculty of Manufacturing Engineering
Project Paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang – 2017
Includes bibliographical references