The effect of quick response manufacturing on supply chain activities in the automotive manufacturing environment / (Record no. 101216)

MARC details
000 -LEADER
fixed length control field 05209ntm a2200337 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110922.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240902s20242024my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009941 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMPSA
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKPM .Y87 2024 r Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohd Yusrizal Bin Mohd Yusoof,
Relator term author.
245 40 - TITLE STATEMENT
Title The effect of quick response manufacturing on supply chain activities in the automotive manufacturing environment /
Statement of responsibility, etc. Mohd Yusrizal Bin Mohd Yusoof
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMPSA,
Date of production, publication, distribution, manufacture, or copyright notice 2024
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2024
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 95 pages :
Other physical details illustration ;
Materials specified 0 cm. +30 cm. +
Accompanying material 1 CD-ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Manufacturing and Mechatronic Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang – 2024
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Includes bibliographical references
520 3# - SUMMARY, ETC.
Summary, etc. Nowadays, manufacturing companies endure a tough time adapting to the world economy, which reaches the customer’s requirement in terms of delivery speed. The automotive industry is one of the essential industries in Malaysia’s manufacturing sector. This study was conducted at the actual industry case study from automotive manufacturers in Malaysia. Company X is a wholly owned subsidiary multinational company in Pekan, Pahang, which focuses on the production of luxury cars. Note that the efficient supply chain and assembly line process in the automotive industry is crucial for streamlining production processes and optimising workflow in manufacturing automotive. The challenges and inefficiency in the production assembly line system can lead to delays and decreased productivity. These issues can result in increased operation costs, longer lead times, and compromised customer satisfaction. The actual situation challenges in the medium automotive manufacturing company is that the material handling layout design did not cater to the production productivity. Hence, the ideal situation of Quick Response Manufacturing (QRM) is an application or planning or an effective strategy for the company to reduce external and internal lead time. The major challenge facing this is to produce more products using little material, little energy, little involvement of labour, and low operation cost. This requires a comprehensive analysis of the existing layout, considering factors such as the layout organisation, set-up time, retrieval processes, and minimisation of part defects. Logistic production planning requires proper planning of supply chain flow to counter unexpected situations such as crippling and delays in delivering the product to the end-users. Such a case could lead to congestion on the flow chain, leading to a longer lead time than any automotive industry organisation tries to avoid the poor arrangement of the supply chain planning toward the assembly line known as the production line. The implication of the problem requires proper planning of supply chain flow to counter unexpected situations such as crippling and delays in delivering the product to the customer. Such a case could lead to congestion on the flow chain, leading to a longer lead time than any automotive industry organisation tries to avoid. Therefore, the intention is to have a pleasant workplace environment and secure from wasted waiting time. The QRM framework resolved the lead-time problem in the supply chain at the production assembly line. This study investigates the effect of the supply chain layout on the production output at the assembly line, analyses an efficient production layout for the QRM supply chain based on simulation methods, and validates the QRM supply chain framework through the Delphi method verification. Thus, the QRM framework resolved the lead-time problem in the supply chain at the production assembly line. The activities involved in the methodology include the problem identification of supply chain activities, simulation analysis, QRM framework establishment, and validation process. The study utilised the QRM tools and simulation analysis during the investigation and later the improvement processes. Subsequently, the implementation of new frameworks QRM at the production assembly line. The final phase is the analysis of new frameworks and validation. To validate this new approach, a Delphi method was used, and experts from the industry gave feedback on the study. Finally, the QRM framework had significantly improved from the initial condition to the latest recorded result. The net overall result of the lead time reduction was 62.2%, and the assembly line production increased from 20 units per shift to 25 units per shift, a 25% increase. The QRM framework had proven to be successful, highlighting the study’s novelty.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Manufacturing and Mechatronic Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
General subdivision Dissertations
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan UMPLIB PEKAN UMPLIB PEKAN 02/09/2024   FTKPM .Y87 2024 r Thesis T000003325 02/09/2024 1 02/09/2024 Thesis
  Not lost Library of Congress Classification   Final Processing UMPLIB PEKAN UMPLIB PEKAN 02/09/2024   CD13667 T000003326 02/09/2024 1 02/09/2024 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us