Factors in ensuring construction readiness in sarawak’s building construction / (Record no. 102245)

MARC details
000 -LEADER
fixed length control field 03298ntm a2200337 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125111024.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 250128t20242024my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009992 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMPSA
Language of cataloging eng
Transcribing agency UMPSA
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .A89 2024 r Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nurul Asyilah Binti Romzi,
Relator term author.
245 10 - TITLE STATEMENT
Title Factors in ensuring construction readiness in sarawak’s building construction /
Statement of responsibility, etc. Nurul Asyilah Binti Romzi
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan Pahang :
Name of producer, publisher, distributor, manufacturer UMPSA,
Date of production, publication, distribution, manufacture, or copyright notice 2024
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice © 2024
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 107 pages :
Other physical details illustration ;
Dimensions 30 cm. +
Accompanying material 1-CD ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang Al Sultan Abdullah – 2024
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Include bibliographical reference
520 3# - SUMMARY, ETC.
Summary, etc. Construction readiness is determined as the main contributor to delay in construction. It is vital to determine the activities and procedures that should be completed prior to construction kick off. These delays often lead to increase of costs, putting contractors at risk. They suffer losses as a result of the project rather than gains. This is because project teams tend to rush into construction without assessing the readiness of the project. Therefore, it is necessary to evaluate a project's readiness. The goal of this research is to examine Sarawak's construction readiness for upcoming development projects. This study aims to accomplish three objectives that have been identified in the study. Firstly, identify the factors influencing the construction project's readiness for implementation. Secondly, rank the critical readiness factors for the project's implementation in Sarawak. Thirdly, categorize the critical construction readiness factors for building projects in Sarawak. In stage one of the studies, the questionnaire is developed from the identified Construction Readiness Factor (CRF), from the literature review. In stage two, the CRFs are ranked based on data analysis from ninety-one replies using the Relative Importance Index (RII). Stage three involves categorizing the critical construction readiness factors. This study focuses on Sarawak's building construction projects. A total of thirty-seven critical CRF for building construction projects are identified. The critical CRF are categorized into four groups, which are “preliminary work and authorities approval”, “procurement and execution,” “documentation and verification” and “capability and project scope”. To sum up, construction readiness is necessary not just at the start of the project but also during the early phase. These CRFs can assist researchers in creating a construction readiness assessment tool for building construction projects, as well as assist industry practitioners in evaluating the readiness of their projects through guideline, framework and checklist.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 28/01/2025   FTKA .A89 2024 r Thesis T000003375 28/01/2025 1 28/01/2025 Thesis
  Not lost Library of Congress Classification       UMPLIB GAMBANG UMPLIB GAMBANG 28/01/2025   CD13693 T000003376 28/01/2025 1 28/01/2025 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us