Factors in ensuring construction readiness in sarawak’s building construction / Nurul Asyilah Binti Romzi

By: Material type: TextTextPublisher: Kuantan Pahang : UMPSA, 2024Copyright date: © 2024Description: xiii, 107 pages : illustration ; 30 cm. + 1-CD ROMContent type:
  • text
Media type:
  • unmediated
Carrier type:
  • volume
ISBN:
  • THE0009992 (Local)
Subject(s): Dissertation note: Thesis (Master of Science) -- Universiti Malaysia Pahang Al Sultan Abdullah – 2024 Abstract: Construction readiness is determined as the main contributor to delay in construction. It is vital to determine the activities and procedures that should be completed prior to construction kick off. These delays often lead to increase of costs, putting contractors at risk. They suffer losses as a result of the project rather than gains. This is because project teams tend to rush into construction without assessing the readiness of the project. Therefore, it is necessary to evaluate a project's readiness. The goal of this research is to examine Sarawak's construction readiness for upcoming development projects. This study aims to accomplish three objectives that have been identified in the study. Firstly, identify the factors influencing the construction project's readiness for implementation. Secondly, rank the critical readiness factors for the project's implementation in Sarawak. Thirdly, categorize the critical construction readiness factors for building projects in Sarawak. In stage one of the studies, the questionnaire is developed from the identified Construction Readiness Factor (CRF), from the literature review. In stage two, the CRFs are ranked based on data analysis from ninety-one replies using the Relative Importance Index (RII). Stage three involves categorizing the critical construction readiness factors. This study focuses on Sarawak's building construction projects. A total of thirty-seven critical CRF for building construction projects are identified. The critical CRF are categorized into four groups, which are “preliminary work and authorities approval”, “procurement and execution,” “documentation and verification” and “capability and project scope”. To sum up, construction readiness is necessary not just at the start of the project but also during the early phase. These CRFs can assist researchers in creating a construction readiness assessment tool for building construction projects, as well as assist industry practitioners in evaluating the readiness of their projects through guideline, framework and checklist.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Collection Call number Copy number Status Date due Barcode
Thesis Thesis UMPLIB GAMBANG Reference FTKA .A89 2024 r Thesis (Browse shelf(Opens below)) 1 Not for loan T000003375
Thesis Thesis UMPLIB GAMBANG CD13693 (Browse shelf(Opens below)) 1 Not for loan T000003376

Faculty of Civil Engineering Technology

Thesis (Master of Science) -- Universiti Malaysia Pahang Al Sultan Abdullah – 2024

Include bibliographical reference

Construction readiness is determined as the main contributor to delay in construction. It is vital to determine the activities and procedures that should be completed prior to construction kick off. These delays often lead to increase of costs, putting contractors at risk. They suffer losses as a result of the project rather than gains. This is because project teams tend to rush into construction without assessing the readiness of the project. Therefore, it is necessary to evaluate a project's readiness. The goal of this research is to examine Sarawak's construction readiness for upcoming development projects. This study aims to accomplish three objectives that have been identified in the study. Firstly, identify the factors influencing the construction project's readiness for implementation. Secondly, rank the critical readiness factors for the project's implementation in Sarawak. Thirdly, categorize the critical construction readiness factors for building projects in Sarawak. In stage one of the studies, the questionnaire is developed from the identified Construction Readiness Factor (CRF), from the literature review. In stage two, the CRFs are ranked based on data analysis from ninety-one replies using the Relative Importance Index (RII). Stage three involves categorizing the critical construction readiness factors. This study focuses on Sarawak's building construction projects. A total of thirty-seven critical CRF for building construction projects are identified. The critical CRF are categorized into four groups, which are “preliminary work and authorities approval”, “procurement and execution,” “documentation and verification” and “capability and project scope”. To sum up, construction readiness is necessary not just at the start of the project but also during the early phase. These CRFs can assist researchers in creating a construction readiness assessment tool for building construction projects, as well as assist industry practitioners in evaluating the readiness of their projects through guideline, framework and checklist.

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us