Planning and scheduling for sport complex : (Record no. 2174)

MARC details
000 -LEADER
fixed length control field 02160nam a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000029331
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204438.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 080609s2007 my f 001 0 eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003484(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151200
Level of effort used to assign nonsubject heading access points irma
Level of effort used to assign subject headings 201107140035
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 201103021458
Level of effort used to assign classification ida
Level of effort used to assign subject headings 200908141328
Level of effort used to assign classification VLOAD
-- 200806091627
-- fara
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TH438.4 .L54 2007 rs Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Liew, Ahu Wen
245 10 - TITLE STATEMENT
Title Planning and scheduling for sport complex :
Remainder of title a case study of Indoor Stadium Terengganu /
Statement of responsibility, etc. Liew Ahu Wen
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2007
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 114 p. ;
Dimensions 30 cm.
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3# - SUMMARY, ETC.
Summary, etc. Planning and scheduling is one of the processes in construction project. A proper planning and scheduling may produce a smooth work flow and ease the monitoring and controlling of project. In Malaysia construction industry, there are no standard guidelines to produce an accurate schedule. In addition, the techniques of the project management software are still new for the users due to lack of expose of the software especially P3. This research is focused on breaking down the work activities into detail level, the theory of time duration and determines the time duration in building construction. Work quantity and productivity of labors/ logistic are identified. Time duration for main structures of sport complex is estimated. From the analysis, the time duration for piling works is 63 days, lower ground floor is 201 days, ground floor is 485 days, first floor is 144 days, second floor is 239 days, third floor is 245 days, fourth floor is 241 days and roof system is 237 days. The overall time duration for this project is 739 days. This research may produce a guideline to the scheduler in estimating time duration for building construction and provide a platform for further study in advances the theory of scheduling.-Author
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building
General subdivision Superintendence
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Production scheduling
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TH438.4 .L54 2007 rs Thesis 0000030421 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us