MARC details
| 000 -LEADER |
| fixed length control field |
02160nam a2200241 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000029331 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204438.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
080609s2007 my f 001 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003484(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905151200 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201107140035 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
201103021458 |
| Level of effort used to assign classification |
ida |
| Level of effort used to assign subject headings |
200908141328 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200806091627 |
| -- |
fara |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH438.4 .L54 2007 rs Thesis |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Liew, Ahu Wen |
| 245 10 - TITLE STATEMENT |
| Title |
Planning and scheduling for sport complex : |
| Remainder of title |
a case study of Indoor Stadium Terengganu / |
| Statement of responsibility, etc. |
Liew Ahu Wen |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2007 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 114 p. ; |
| Dimensions |
30 cm. |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Planning and scheduling is one of the processes in construction project. A proper planning and scheduling may produce a smooth work flow and ease the monitoring and controlling of project. In Malaysia construction industry, there are no standard guidelines to produce an accurate schedule. In addition, the techniques of the project management software are still new for the users due to lack of expose of the software especially P3. This research is focused on breaking down the work activities into detail level, the theory of time duration and determines the time duration in building construction. Work quantity and productivity of labors/ logistic are identified. Time duration for main structures of sport complex is estimated. From the analysis, the time duration for piling works is 63 days, lower ground floor is 201 days, ground floor is 485 days, first floor is 144 days, second floor is 239 days, third floor is 245 days, fourth floor is 241 days and roof system is 237 days. The overall time duration for this project is 739 days. This research may produce a guideline to the scheduler in estimating time duration for building construction and provide a platform for further study in advances the theory of scheduling.-Author |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Building |
| General subdivision |
Superintendence |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production scheduling |