MARC details
| 000 -LEADER |
| fixed length control field |
02583ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000083059 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113232.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
141105t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007638(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171201 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201411101018 |
| Level of effort used to assign classification |
Fida |
| -- |
201411051057 |
| -- |
Fida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS178 .C48 2013 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Chua, Yee Leong |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement in SME industry through new plant layout design by using witness softwar / |
| Statement of responsibility, etc. |
Chua Yee Leong |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 81 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 78-79 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Productivity is a measure of performance in the industry, organization or factory. The project is focused on bread production line in a factory of Mama Bake Industry. The study is about improving production productivity, reducing the waiting time in production, increase the production in one day in order to achieve target in shorter time. Initially, collection data in terms of cycle times of each machine or workstations, the area require by the workstations. During the visit to the factory, observation period is about a day, the tools used to record time and measure distance, area required by each workstation, and area of the factory is done by using Smart Phone Atrix 2 with stopwatch and smart measure which have the function to measure the distance of the object to the user. After data are collected, following by using Witness software, the original plant layout model is created, then 4 other new layout model is created and simulate all of them together with the original layout, then the productivity and the efficiency of the layout is calculated and record in the result. From the study, the main problem found is the space are small, some process stuck due to not enough capacity in buffer provide, where the bottleneck occur, but removing the walls, and balanced the production line more buffer capacity can be provided, thus the process can proceed without delay and waiting. Among all new layouts being proposed and simulated in Witness Software, the one with higher improvement in productivity and plant layout efficiency will be chosen. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Plant layout |
| General subdivision |
Planning |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial productivity |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Furniture industry and trade |