A study of causes and effects of project change in construction industry / (Record no. 5218)

MARC details
000 -LEADER
fixed length control field 01896ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000083185
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113233.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141110t2013 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001541(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271054
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201502021052
Level of effort used to assign classification fawwaz
Level of effort used to assign subject headings 201411131331
Level of effort used to assign classification training1
Level of effort used to assign subject headings 201411101020
Level of effort used to assign classification training1
-- 201411101003
-- training1
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD69.P75 J44 2013 r Bc.
100 3# - MAIN ENTRY--PERSONAL NAME
Personal name Jee, Keh Lih
245 12 - TITLE STATEMENT
Title A study of causes and effects of project change in construction industry /
Statement of responsibility, etc. Jee Kee Lih
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 148 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 131-138
520 3# - SUMMARY, ETC.
Summary, etc. The problem of project change in construction industry frequent occur and result in cost overrun, project delay, quality defects and other negative impact. In this study, it discusses about the causes and effect of project change in construction industry. The scope of this study is focusing on construction industry in order to examine the causes and effect of project change. The most important causes and effect will be ranking .Besides that, in this research the empirical relationship between causes and effects of project change will also be examined. A questionnaire survey was conducted to find out the causes and effect of project change. The field survey conducted included contractor, consultant and developer. About 45 respondents had participant in this research.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Organizational change
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Organizational change
General subdivision Management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD69.P75 J44 2013 r Bc. 0000090214 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8472 | HD69.P75 J44 2013 r Bc. 0000090215 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us