MARC details
| 000 -LEADER |
| fixed length control field |
02185ntm a2200277 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000091166 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113300.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150907t2014 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003478(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905151155 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201711291000 |
| Level of effort used to assign classification |
saini |
| Level of effort used to assign subject headings |
201509071526 |
| Level of effort used to assign classification |
asma |
| -- |
201509071522 |
| -- |
asma |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH438.15 .L56 2014 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Ling, Zhi Jia |
| 245 10 - TITLE STATEMENT |
| Title |
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia / |
| Statement of responsibility, etc. |
Ling Zhi Jia |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2014 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xv, 90 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 66-70 |
| 520 ## - SUMMARY, ETC. |
| Summary, etc. |
This thesis is about impact of cost overrun to the project delay in the project life cycle. This study will focus on the Grade 7 construction companies in the Pahang. 40 project managers and site contractors from the construction industry in Pahang participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay). Reliability test is used to identify whether the variable is reliable or not. The result of Cronbach’s Alpha for all variables shows that the involved variables are reliable ranging from 0.874 to 0.951. Single mean t-test is used to identify the environmental factor which shows a high value of 4.37. Pearson correlation results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction industry |
| General subdivision |
Management |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Cost effectiveness |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/18447">http://ecollib.ump.edu.my/id/eprint/18447</a> |
| Public note |
Access in library only |