Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia / Ling Zhi Jia

By: Material type: TextTextPublication details: Kuantan, Pahang : UMP, 2014Description: xv, 90 p. : ill. (some col.) ; 30 cm. + 1 CD-ROMISBN:
  • THE0003478(Local)
Subject(s): Online resources: Dissertation note: Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 Summary: This thesis is about impact of cost overrun to the project delay in the project life cycle. This study will focus on the Grade 7 construction companies in the Pahang. 40 project managers and site contractors from the construction industry in Pahang participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay). Reliability test is used to identify whether the variable is reliable or not. The result of Cronbach’s Alpha for all variables shows that the involved variables are reliable ranging from 0.874 to 0.951. Single mean t-test is used to identify the environmental factor which shows a high value of 4.37. Pearson correlation results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode
Final Year Report Final Year Report UMPLIB GAMBANG TH438.15 .L56 2014 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000100767
Final Year Report Final Year Report UMPLIB GAMBANG CD 9028 | TH438.15 .L56 2014 r Bc. (Browse shelf(Opens below)) 1 Not for loan 0000100768

Faculty of Industrial Management

Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014

Bibliography : p. 66-70

This thesis is about impact of cost overrun to the project delay in the project life cycle. This study will focus on the Grade 7 construction companies in the Pahang. 40 project managers and site contractors from the construction industry in Pahang participated in the survey questionnaire. There are two variable in this study which are independent variables (Cost overrun factors) and dependent variable (Project delay). Reliability test is used to identify whether the variable is reliable or not. The result of Cronbach’s Alpha for all variables shows that the involved variables are reliable ranging from 0.874 to 0.951. Single mean t-test is used to identify the environmental factor which shows a high value of 4.37. Pearson correlation results indicate that the all the cost overrun factors has a positive relationships with the project delay. Finding in this study is beneficial to employer to understand how important cost overruns factors to project delay, as well as to prevent recurrences from happening in construction industry

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us